Engineering (non-software)
Before
Responsible for improving production line efficiency.
After
Raised line throughput from 820 to 1,050 units per shift by resequencing two assembly stations and adding a buffer conveyor.
A before-and-after pair makes the gain auditable; "improving" could mean 2% or 200%.